Getting Your Site Ready for a Concrete Lorry
Plan Ahead for a Smooth Delivery
Having ready mix concrete arrive at your property is a big step in any project. Whether you are pouring a new driveway, a shed base, or footings for an extension, the delivery itself is only part of the story. The real work begins before the mixer truck ever turns onto your street. Proper site preparation saves time, reduces waste, and helps ensure the concrete performs as it should. This article walks through the key steps to take before the truck arrives, so the pour goes as smoothly as possible.
Check Site Access First
The first thing to consider is whether the delivery vehicle can actually reach the pour area. A typical mixer truck is large and heavy. It needs a clear path with a solid surface, a minimum width of about three metres, and enough height clearance for the drum and chute. Overhanging branches, low cables, narrow gateways, or weak ground can all stop the truck in its tracks. Walk the route the driver will take. Mark any obstacles and plan how to deal with them. If the access is tight, you may need to arrange for a smaller vehicle or a pump, but that is a decision to make early on.
Prepare the Ground and the Formwork
The ground where the concrete will be placed must be properly prepared. This means the sub-base is compacted and level, and the formwork (the wooden or metal frames that hold the concrete in place) is secure and set to the correct height. Check that the formwork is braced well enough to withstand the pressure of wet concrete. If it shifts during the pour, the slab will be out of shape. Also make sure there are no soft spots or loose soil that could mix with the concrete and weaken the finished slab. A little extra time spent on the ground preparation often saves a lot of trouble later.
Think About the Discharge Point
The discharge point is where the chute of the truck will release the concrete. This needs to be as close to the final position of the pour as possible. If the truck cannot get within reach of the chute, you will need a pump, a conveyor, or a plan to move the concrete with wheelbarrows. Moving concrete by wheelbarrow is hard work and must be done quickly before the mix begins to set. Have enough people and wheelbarrows ready if that is your plan. Also clear a path from the discharge point to the pour area, with no trip hazards or deep mud. Every extra minute spent moving concrete adds risk of a cold joint or a poor finish.

Arrange the Pour Sequence
For larger slabs or foundations, think about the pour sequence before the truck arrives. Concrete sets in a predictable time window, so you need to work methodically from one end to the other. Decide where the first load will go and how you will spread and compact it. If the pour is too large to finish in one continuous operation, you may need a construction joint. Talk to your supplier about the expected setting time for the mix you have ordered. This is especially important in warm weather, when concrete sets faster, or in cold weather, when it sets slower. A good pour sequence keeps the crew busy without rushing and without leaving gaps.
Ensure Good Weather and Timing
Weather plays a big part in concrete work. Heavy rain can wash out the surface, while strong sun and wind can cause rapid drying and cracking. Check the forecast for the day of the pour and the following day. If rain is likely, have covers ready. If it is very hot, consider ordering a mix with retarder to give you more working time. If it is cold, the concrete may need protection from frost. Also confirm the delivery window with your supplier. A typical delivery window is narrow, often just a few hours. Make sure everyone on site is ready before the truck leaves the plant. Wasting time while the driver waits costs money and can affect the quality of the concrete.
Have the Right Tools and People on Site
Before the truck arrives, gather all the tools you will need. This includes shovels, rakes, floats, tampers, a straight edge for levelling, a concrete vibrator if required, and enough wheelbarrows if you are moving concrete by hand. Also have a hose and water supply ready for cleaning tools and for any minor adjustments to the mix. Make sure the crew knows their roles. Someone should be directing the driver, someone else spreading and levelling, and another person finishing the surface. Clear communication prevents mistakes and keeps the pour moving steadily. If you are using a pump, have the pump operator confirm the setup before the concrete arrives.
Consider the Curing Process
Curing is the step that happens after the pour, but it starts with planning. Concrete gains strength through a chemical reaction that requires moisture. If the surface dries out too quickly, the concrete will crack and be weaker. Have a plan for keeping the concrete damp after it is placed. This could mean covering it with plastic sheeting, wet hessian, or a curing compound. The curing period typically lasts several days, and the weather will influence how you manage it. If you have not thought about curing before the pour, you might end up with a slab that looks fine but lacks strength. It is a simple step that makes a big difference.

Communicate Clearly with the Supplier
Good communication with the concrete supplier is essential. When you place your order, tell them the exact volume required, the type of mix, and any special requirements like a retarder or fibre reinforcement. Also let them know about site access issues and the delivery window. They can advise on the best mix for your job and the most practical way to deliver it. On the day of the pour, have a contact number ready in case the driver needs directions or there is a last-minute change. A well-informed supplier helps you get concrete delivered when needed, without delays or misunderstandings.
Manage the Discharge Speed
When the truck arrives, the driver will control the speed of the drum and the chute. You can ask them to slow down or speed up the discharge depending on how fast your crew can handle the concrete. Pouring too fast can cause the concrete to spill or separate, while pouring too slowly can mean the mix starts to set before it is all placed. Keep an eye on the consistency of the concrete as it comes out. If it looks too dry or too wet, tell the driver immediately. They may be able to adjust the mix slightly, but only within limits. Never add water to the concrete yourself without consulting the driver, as this weakens the mix.
Watch the Setting Time
Once the concrete is in place, you have a finite amount of time to finish it. The setting time depends on the mix, the temperature, and the thickness of the slab. In hot weather, you may have as little as an hour. In cooler conditions, you might have several hours. Keep the crew focused on the finishing work as soon as the concrete is levelled and compacted. Do not start another part of the pour until the current section is properly finished. If you are unsure about the timing, ask your supplier for guidance before the day. They know how their mixes behave in different conditions.
Plan for the Clean-Up
Concrete hardens fast, and cleaning tools and equipment is much easier before it sets. Have a washout area ready where the driver can rinse the chute and drum after the pour. This should be a contained area away from drains, waterways, and garden beds, since concrete wash water is alkaline and can harm plants and aquatic life. Also clean your own tools and wheelbarrows as soon as the pour is done. A bucket of water and a stiff brush can save you from having to chip off hardened concrete later. The clean-up is not glamorous, but it is part of the job.

Stay Flexible
Even with the best planning, things can change. The weather might shift, the truck might be delayed, or the ground conditions might be different from expected. Stay flexible and have a backup plan. If the concrete arrives and the site is not ready, you might have to refuse the load, which wastes money and material. That is why site preparation is so important. When everything is in place, the pour becomes a straightforward process. You get concrete delivered when needed, and the result is a strong, durable slab that does exactly what you wanted.